Get started
TESFA / KNOWLEDGE

Start with preventive maintenance

Go from a prioritized set of devices to an actionable plan.

PRACTICAL GUIDE

Select your preferred device and target.

Not every asset needs the same scheduling. Start with a group of equipment that has a clear impact on operations, has a person in charge, and has data or instructions to prepare the test content.

PRACTICAL GUIDE

Scheduling from an explainable basis.

Manufacturer's instructions, service conditions and work history are information to consider. The cycle must be consistent with the actual context and evaluated by a professional; Do not apply the same frequency to all devices.

PRACTICAL GUIDE

Write actionable content.

A checklist needs to clearly state the operations, the results to be recorded, and what to do when abnormalities are detected. Use expressions that the technician can perform at the device; Avoid overly general lines like “full inspection.”

PRACTICAL GUIDE

Prepare resources before implementation day.

Confirm who is in charge, when equipment and supplies are accessible. Coordinate with operations when work requires stopping the machine. Safety-related steps must follow the unit's professional procedures.

PRACTICAL GUIDE

Look back instead of keeping a fixed schedule forever.

Keep track of work due dates, test results, and reasons for postponement. Use performance information to discuss cycles or what needs to be adjusted, rather than just counting the number of closed jobs.

WITH TESFA CMMS

Starting from your needs.

A specific situation is the starting point for a productive conversation.

Discuss your situation